ID :
156309
Fri, 01/07/2011 - 22:53
Auther :
Shortlink :
https://www.oananews.org//node/156309
The shortlink copeid
SOCAR conducts 7,369 drilling works in December 2010
Baku, January 7 (AzerTAc). SOCAR (except Joint Ventures and Operating Companies) conducted 7,369 meters drilling works in December, 2010. Of this amount, development drilling made up 7,169 m and exploration drilling 200 m (whole exploration drilling falls to the share of the test drilling). As a whole, in January-December of 2010, SOCAR (except Joint Ventures and Operating Companies) conducted 136,324 m drilling works including 127,858 m development drilling and 8,466 m exploration drilling (with 1,785 m test drilling).