ID :
33395
Tue, 12/02/2008 - 01:03
Auther :
Shortlink :
https://www.oananews.org//node/33395
The shortlink copeid
SWCC signs Jeddah desalination Plant's 3rd phase contract
Jeddah, December 01, SPA -- Minister of Water and Electricity Eng
Abdullah Bin Abdul Rahman Al-Husayen, who is also Chairman of the
Board of Directors of Saline Water Conversion Corporation (SWCC)
signed a 36-months contract with Korean Doosan Heavy Industries &
Construction; Doosan Hydro Technology and Saudi Berkefeld Co for the
execution of the 3rd phase of Jeddah Desalination Plan.
The plant, which uses the reverse osmosis process, is estimated
to cost SR 1,099,308,420. It will have a production capacity of
240,000 cubic meters per day.
The project includes the rehabilitation of sea-water in-takes and
the initial treatment of sea water and high-pressure pumps.
The signing of the contract came in line with the directives of the
Custodian of the Two Holy Mosques to provide potable water to
citizens and residents as part of efforts to address water shortages
in the province of Jeddah and strengthening water resources.
--SPA
Abdullah Bin Abdul Rahman Al-Husayen, who is also Chairman of the
Board of Directors of Saline Water Conversion Corporation (SWCC)
signed a 36-months contract with Korean Doosan Heavy Industries &
Construction; Doosan Hydro Technology and Saudi Berkefeld Co for the
execution of the 3rd phase of Jeddah Desalination Plan.
The plant, which uses the reverse osmosis process, is estimated
to cost SR 1,099,308,420. It will have a production capacity of
240,000 cubic meters per day.
The project includes the rehabilitation of sea-water in-takes and
the initial treatment of sea water and high-pressure pumps.
The signing of the contract came in line with the directives of the
Custodian of the Two Holy Mosques to provide potable water to
citizens and residents as part of efforts to address water shortages
in the province of Jeddah and strengthening water resources.
--SPA